Page Index Toggle Pages: 1 Send TopicPrint
Normal Topic Using two versions of FlowChart .NET (Read 1530 times)
David Long
Full Member
***
Offline


I love YaBB 1G - SP1!

Posts: 125
Location: England
Joined: Oct 23rd, 2006
Using two versions of FlowChart .NET
Jul 31st, 2009 at 11:54am
Print Post  
I have a project that contains three executables that use FlowChart .NET 4.3.1.  Due to time/money considerations I only want to upgrade one of them to 5.3.1 at this time.  Is it possible to produce a Visual Studio solution and setup project that allows this?

Thanks
David
  
Back to top
 
IP Logged
 
Stoyo
God Member
*****
Offline


MindFusion support

Posts: 13230
Joined: Jul 20th, 2005
Re: Using two versions of FlowChart .NET
Reply #1 - Jul 31st, 2009 at 1:31pm
Print Post  
It shouldn't be a problem if you install the assemblies in the GAC. Otherwise you could install the executables in different subfolders.

I hope that helps,
Stoyan
  
Back to top
 
IP Logged
 
Aziz ur Rahman
YaBB Newbies
*
Offline



Posts: 43
Joined: Feb 23rd, 2009
Re: Using two versions of FlowChart .NET
Reply #2 - Aug 1st, 2009 at 6:13am
Print Post  
In case you projects (using different versions of mind fusion) are referencing each other, you can use assembly remapping in app.config.

We were having the same problem and we did this.
  

Syed Aziz ur Rahman
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Send TopicPrint