Ensures that the specified date is visible within the control, scrolling the contents of the control if necessary. The resource parameter allows specifying a Task, Location, Contact or Resource for which to display the date in a view with enabled grouping.
Namespace: com.mindfusion.scheduling
Package: com.mindfusion.scheduling
Java Copy Code |
---|
public void ensureVisible ( |
This method does nothing if the specified date is not included in the time-period displayed in the current view.
JPlanner Programmer's Guide | © 2023 MindFusion |