Page Index Toggle Pages: 1 Send TopicPrint
Normal Topic Switching between month/weekview and dayview takes long (Read 4091 times)
SLUser
YaBB Newbies
*
Offline


I Love MindFusion!

Posts: 34
Joined: Dec 7th, 2012
Switching between month/weekview and dayview takes long
Dec 17th, 2012 at 9:36pm
Print Post  
It takes about 4 to 5 seconds before the calendar show the day view even with an empty calendar. Is this normal ?
Can anything be done to speed this up ?

Thanks
  
Back to top
 
IP Logged
 
Meppy
God Member
*****
Offline


MindFusion support

Posts: 1783
Joined: Jul 20th, 2005
Re: Switching between month/weekview and dayview takes long
Reply #1 - Dec 18th, 2012 at 8:21am
Print Post  
You can speed up switching between views by using separate Calendar controls for each view, then just toggle the visibility of the controls in order to display the one that you need. It is important to assign the same Schedule object to all controls so they are automatically synchronized when the schedule is changed.

Let me know if this helps.

Regards,
Meppy
  
Back to top
 
IP Logged
 
SLUser
YaBB Newbies
*
Offline


I Love MindFusion!

Posts: 34
Joined: Dec 7th, 2012
Re: Switching between month/weekview and dayview takes long
Reply #2 - Dec 19th, 2012 at 6:43pm
Print Post  
OK. This seems to work and is indeed a lot faster when switching (only the first time the timetable is shown is still slow).
Thanks.
  
Back to top
 
IP Logged
 
Page Index Toggle Pages: 1
Send TopicPrint